ClientWashington State Department of Transportation
LocationWashington State
DivisionEnergy

View all Projects ▸
WSDOT Fuel System Replacement Contract

This multi-year, multi-site contract includes removal of existing underground storage tanks and equipment, installation of aboveground storage tanks, fuel dispensers and piping replacement, concrete tank foundations,islands, and drive slabs, and stormwater improvements, including installation of oil/water separators, catch basins, bioswales, and other site improvements.

Similar Projects

Projects